Investment in private nuclear fusion startups reached $6.2 billion, with funding shifting sharply toward compact tokamak designs using rare-earth barium copper oxide magnet tapes.
Magnetic Field Strength Improvements
Doubling the magnetic field strength allows for an eightfold reduction in the plasma volume required to achieve net energy gain, dramatically lowering civil engineering costs.
Neutron Damage and Material Limits
The primary engineering bottleneck remains structural material degradation from high-energy fast neutrons, requiring novel tungsten alloys for internal vacuum vessel shielding.