Global semiconductor manufacturers are confronting renewed timeline pressure as high-numerical aperture extreme ultraviolet (EUV) lithography equipment faces assembly delays. The bottleneck threatens to push back volume production for sub-2nm nodes previously targeted for early 2025.
Capital Expenditure Realignment
Foundries are re-evaluating capital allocation strategy, shifting short-term expenditure toward legacy node optimization and advanced packaging facilities to maintain yield commitments.